Widgetized Section

Go to Admin » Appearance » Widgets » and move Gabfire Widget: Social into that MastheadOverlay zone


Scheduled Power Cuts August 2013

The PEA Koh Samui have announced the following Power Cuts for the month of August to upgrade the high voltage cables. All cuts are scheduled from 8am to 3 pm.

6 August:

From Sirisin Store to Chaweng Police Box. Cut only on Sirisin side not on Tesco side.

8 August:

From Samui Arena Stadium(not including the stadium) to Soi Water Bank, including Krungsri Bank, PTT Chaweng, and Baan Had Ngam School.

9 August:

From Chaweng Police Station/Wat Sawang Arom to Samui Arena Stadium(Including Stadium).

13 August:

From Samui Arena Stadium(not include Stadium) to Bangkok Hospital, including Krungsri Bank, PTT Chaweng, and Baan Had Ngam School.

 

 

 

 

Comments

comments

If you like a story please share and like it with all your friends and leave comments above.
Do you have an interesting story or Tip-Off for Samui Times then visit the TIP-OFF Page Here

You must be logged in to post a comment Login